Case
VR

Precautions for first-time installation of industrial chillers

The matters that need attention during the initial installation of the chiller have five points: making sure the accessories are complete, ensuring the working voltage of the chiller is stable and normal, matching the power frequency, forbidden to run without water, and making sure that the air inlet and outlet channels of the chiller are smooth!


As a good helper for cooling industrial laser equipment, what are the matters that need attention during the initial installation of the chiller?


1. Make sure the accessories are complete.
Check the accessories according to the list after the new machine is unpacked to avoid the failure of normal installation of the chiller due to the lack of accessories.


2. Ensure the working voltage of the chiller is stable and normal.
Make sure the power socket is in good contact and the ground wire is grounded reliably. It is necessary to pay attention to whether the power cord socket of the chiller is connected well and the voltage is stable. The normal working voltage of S&A standard chiller is 210~240V (110V model is 100~120V). If you really need a wider operating voltage range, you can customize it separately.

3. Match the power frequency.
Mismatched power frequency can cause damage to the machine! Please use the 50Hz or 60Hz model according to the actual situation.


4. It is strictly forbidden to run without water.
The new machine will empty the water storage tank before packing, please ensure that the water tank is filled with water before turning on the machine, otherwise the pump will be easily damaged. When the water level of the tank is below the green (NORMAL) range of the water level meter, the cooling capacity of the cooling machine will drop slightly, please ensure that the water level of the tank is within the green (NORMAL) range of the water level meter. It is strictly forbidden to use the circulation pump to drain the water!

5. Make sure that the air inlet and outlet channels of the chiller are smooth!

The air outlet above the chiller should be more than 50cm away from the obstacle, and the air inlet on the side should be more than 30cm away from the obstacle. Please make sure the air inlet and outlet of the chiller are smooth!


Please follow the above tips to install the chiller correctly. The dust net will cause the chiller to malfunction if it is severely blocked, so it must be dismantled and cleaned regularly after the chiller has been in use for a period of time.


Good maintenance can keep the chiller's cooling efficiency and extend the service life.

S&A CWFL-1500 Chiller


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

We're here for you when you need us.

Please complete the form to contact us, and we'll be happy to help you.

Send your inquiry

Choose a different language
English
العربية
Deutsch
Español
français
italiano
日本語
한국어
Português
русский
简体中文
繁體中文
Afrikaans
አማርኛ
Azərbaycan
Беларуская
български
বাংলা
Bosanski
Català
Sugbuanon
Corsu
čeština
Cymraeg
dansk
Ελληνικά
Esperanto
Eesti
Euskara
فارسی
Suomi
Frysk
Gaeilgenah
Gàidhlig
Galego
ગુજરાતી
Hausa
Ōlelo Hawaiʻi
हिन्दी
Hmong
Hrvatski
Kreyòl ayisyen
Magyar
հայերեն
bahasa Indonesia
Igbo
Íslenska
עִברִית
Basa Jawa
ქართველი
Қазақ Тілі
ខ្មែរ
ಕನ್ನಡ
Kurdî (Kurmancî)
Кыргызча
Latin
Lëtzebuergesch
ລາວ
lietuvių
latviešu valoda‎
Malagasy
Maori
Македонски
മലയാളം
Монгол
मराठी
Bahasa Melayu
Maltese
ဗမာ
नेपाली
Nederlands
norsk
Chicheŵa
ਪੰਜਾਬੀ
Polski
پښتو
Română
سنڌي
සිංහල
Slovenčina
Slovenščina
Faasamoa
Shona
Af Soomaali
Shqip
Српски
Sesotho
Sundanese
svenska
Kiswahili
தமிழ்
తెలుగు
Точики
ภาษาไทย
Pilipino
Türkçe
Українська
اردو
O'zbek
Tiếng Việt
Xhosa
יידיש
èdè Yorùbá
Zulu
Current language:English